TEMA, GHANA — CH Group will commission the clean-power programme at the Tema Petroleum Terminal Complex, expanding on-site generation that supports safer, lower-emission terminal operations.
The initiative pairs solar capacity with operational upgrades so loading, storage, and control systems can run with less reliance on grid-only supply during daytime operations.
"Clean power at the terminal is part of making Tema a reliable, future-ready logistics hub for Ghana and the region."














